Digitraffic MQTT bridge ● healthy

AFIR corridors

TEN-T core-network coverage against the AFIR light-vehicle rule: a publicly accessible ≥150 kW DC charging pool at least every 60 km along each corridor (pool within 3.0 km of the centerline counts as coverage).

Corridor geometry is an approximate corridor centerline (simplified), hand-traced through the major cities each E-road passes — not authoritative TEN-T data. Coverage counts pool ≈ location and ignores pool output capacity, 350 kW/truck targets, and the comprehensive-network deadline (v1 scope).

Measuring corridors…